All TrailWatches

Lttle Miami Trail

The paving of the 11 bridges will begin this Monday June 1 and should be completed by Friday June 5. The trail will be completely closed for 25 miles—- from Hedges Road (mile marker 3.0) in the north to Morrow (mile marker 28.0) in the south.

However, the entire trail south of Morrow will remain open, i.e. Morrow, Peters Cartridge, Loveland, Milford, Terrace Park, Bass Island, etc.

Posted on May 29, 2009 by bill

Great Miami River Trail

Rode portion of trail starting at parking area east of Troy off of Rt. 41. Nice ride with connector to downtown Troy and section now open to the south. The south section runs through wooded area with gentle curves and rolling terrain. Trail runs through Tipp City and terminates currently at Kyle park. Very nice ride and will be even better when connected to Taylorsville section in near future.

Posted on Apr 02, 2009 by funrider

Buck Creek Trail

Trail along creek is clear and clean. Rode to Old Reid Park and on to Clarence Brown Reservoir. All roads in State park are repaved and smooth for great riding and scenery.

Posted on Mar 18, 2009 by funrider

Simon Kenton Trail

Rode trail from Springfield to Urbana on Saturday. All cleaned up except for small twigs. Great ride, great weather! Think Spring…..

Posted on Mar 11, 2009 by funrider
Page 3 of 17 pages
 <  1 2 3 4 5 >  Last »